520 Bridge Closed this Weekend

520 bridge is closed this weekend in preparation for the opening of the new floating bridge. Westbound lanes of the new 520 bridge are slated to open on April 11th, while Eastbound lanes will open later in the month, April 25th. Watch for some potential traffic headaches while commuters familiarize themselves with the new bridge and figure out the merging system where the bridge narrows from three to two lanes at Foster Island on the Westbound side. Click here for the most current updates.

#seattle #trafficmess #520

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

Copyright © STATUS PENDING 2012 WWW.SEATTLEHOMESAVVY.COM  | All rights reserved.

 

  • RSS Social Icon
  • Houzz Social Icon
  • Yelp! App Icon
  • Facebook Classic
  • Twitter Classic
  • LinkedIn Classic